Doubling short-run capacity at a commercial cabinet shop
- Client
- Commercial millwork and cabinetry
- Sector
- Wood products
- Length
- 12 weeks
- Year
- 2025
- 9 minAverage changeover, from 45
- 2.1xShort-run orders accepted per month
- 0New equipment purchased
Sample case study and figures, written for this template
The situation
A cabinet shop serving hospitals and schools was turning down small orders because every job meant several long changeovers on its edge bander.
What we did
Filming the changeover
We filmed three changeovers and listed every step. Two thirds of the time was spent looking for tools, glue and the right roll of edge tape.
Everything on one cart
A cart for each material family, with tools, settings sheets and tape, staged before the previous job finished.
Jobs sequenced by material
The schedule grouped jobs by board and tape color each morning, so many changeovers disappeared altogether.