Nell Ostrander, operations consultant
Shorter lead times for manufacturers who can't stop the line to fix it
I work on your floor with the people who run it, find the two or three things that actually hold orders up, and change them while you keep shipping.
Diagnostic summary
Valve assembly, 140 people
Quoted lead time, days
Kitting moved upstream of the test cell in week 6
| Before | After | |
|---|---|---|
| Quoted lead time | 31 days | 13 days |
| On-time shipments | 64% | 93% |
| Overtime hours a week | 410 | 120 |
Ways to work together
Operations diagnostic
A close look at how an order actually moves through your plant, from quote to dock, with a short written report and a ranked list of what to change first.
Lead time program
We pick the constraint that matters most and change it together: layout, scheduling rules, kitting, changeovers, whatever the data says. Weekly reviews, measured results.
Interim operations lead
When a plant manager or operations director leaves suddenly, I step in to keep the floor steady and help you hire the right person.
Owner advisory
A monthly half day with the owner or leadership team to review the numbers, think through capital decisions and keep improvement work moving.
How an engagement runs
The same four steps whether it's two weeks or six months
- 1
Walk the floor
I start where the work happens, following real orders and talking to the people who touch them. No surveys, no workshops in a hotel.
- 2
Measure what's slow
Queue times, changeovers and rework, measured by hand for a week if that's what it takes. The numbers usually surprise everyone.
- 3
Change one thing
We pick the change with the biggest effect on lead time and make it properly, with your team, before moving on.
- 4
Hand it over
Your supervisors run the new routine without me. I check back at 30 and 90 days to see that it held.
Recent work
All case studiesCutting a valve maker's lead time from 31 days to 13
Orders waited days for parts to be gathered before the test cell. Moving kitting upstream and setting a simple pull signal freed the whole line.
- Quoted lead time, from 31
- 13 days
- On-time shipments, from 64%
- 93%
- Second test cell no longer needed
- $1.2M
Sample case study
Doubling short-run capacity at a commercial cabinet shop
Changeovers on the edge bander took 45 minutes. Standard carts, presets and a sequence by material brought them under 10.
Steadying a plastics plant through a leadership change
After the plant manager left, I ran operations for five months, kept delivery above 95% and helped hire a permanent successor.
Notes from the floor
All insightsThe machine you don't need yet
Before you buy capacity, find out how long your orders wait in front of the machine you think is the problem.
Four numbers on the board
A morning production meeting works when it's short, it's at the same time every day, and everyone looks at the same four numbers.
Kitting before assembly, not before test
Where you gather parts for an order decides how long that order waits. Moving it one step upstream can change the whole line.
Thirty minutes, no slides
Tell me what's late, what's piling up and what you've already tried. If I can help, I'll say how; if I can't, I'll suggest who can.